The project
The board
The plan made visible: a goal, milestones, sprints, and cards that each carry acceptance criteria, an owner and a cost.

F-12 to F-18, F-21
A card crosses the board
Follow card T2 from To do to Done. Each step is a rule the product enforces in code.
Schematic. The card's states and their order are the product's own rules (F-14, F-18).
To do: a card with a contract
T2 carries its acceptance criteria, its owner and its cost. It becomes ready once the cards it waits for are Done.
In progress: intent first
Kai says what he will change and why. His write tools refuse until he has.
Build and proof
Whole files in the app's own sandbox; the gate runs the type-check and loads the app on a desktop and at 390 px in a real browser.
A restore point and a handoff
The turn ends in a commit. The handoff carries the files, what to watch for and the gate's evidence into the next agent's prompt.
In review
Rev reads the diff on both screen sizes. Findings go into Kai's next prompt, and he revises in the same run.
Waiting for you
On an Agency team, or when the policy asks, the card waits for your acceptance before the next writer starts.
Done, honestly
Only when the gate passed, the review approved, a file changed, no write was cut off, and you accepted where asked.
F-21
Five columns, or a dependency graph
The same board two ways: To do, In progress, In review, Waiting for you and Done; or the cards as a graph of what waits for what.
Columns
Graph
Badges
Who works next
Editing the plan
People and agents share one board. Every change is attributed, and what is already built is never thrown away silently.
- Add and edit
- Cards, sprints and milestones; each card needs at least one acceptance criterion.
- Plan again
- The lead replaces only cards that were never started.
- Reset a stuck card
- Puts one card back without touching the others.
- Run the board
- On an idle project, a team run over every card not Done, in board order.
- From the API
- POST /api/projects/{id}/team/cards, or the MCP tool add_card.
- From a tracker
- A labelled issue becomes a card and a run (a check against real accounts is coming).
F-17
Ghost cards: changes you decide
When you speak mid-run, the lead proposes typed changes to the plan. They appear on the board as dashed ghost cards with their cost.
A change that edits no card and adds at most US$0.20 carries on at once. Anything else waits for Apply, Edit, Keep plan or Stop. No timer ever decides.
- 572-980 ms for an accepted change of plan to reach the board

- 1Maya waits for you. The lead has proposed a change; the team waits.
- 2You have the floor. Kai paused after types.ts. A proposal waits.
- 3A typed change. T2 rewritten with four acceptance criteria that bring in the waitlist.
- 4You decide. Apply, Edit, Keep plan or Stop. No timer ever decides.
The honest estimate
An estimate only when it has held
A time estimate is shown only while it held the real finish on at least 7 of the last 10 measured team runs. Otherwise it is withheld, and the board says why.
On the screenshot it had held 5 times in 10, so it is hidden. The progress bars count Done cards, not guesses.

- 1Goal and milestone. Progress counted in cards that are Done: 1 of 2.
- 2An honest estimate. Withheld: it held the real finish on 5 of the last 10 runs, and shows only from 7.
- 3Ready for Ivy. T2, the look and the phone layout, US$0.08 so far.
- 4Done. T1 passed the gate and one review round, US$0.24.
- 5The gate's evidence. Type-checks and Rev's desktop and phone checks, line by line.
F-09
The same board on a phone
One bar switches between Chat, Preview, Board, Code and More. Every page of the product was checked at phone width: 636 screenshots at four widths, none wider than the screen.

Questions people ask
Not answered here? Write to [email protected].
Can I change the plan while the team works?
Yes. Speak in the room and the lead proposes typed changes as dashed ghost cards with their cost. Nothing changes on the board until you choose Apply, Edit, Keep plan or Stop. An applied change reached the board in 572-980 ms at round 8.
Why is there no time estimate on my board?
A time estimate is shown only while it held the real finish on at least 7 of 10 measured team runs. Otherwise the board says it is withheld, and why.
Can I add my own cards?
Yes: add and edit cards, sprints and milestones. A card needs at least one acceptance criterion. On an idle project, Run the board starts a team run over every card not Done. The API and the MCP server can add cards too.
What does dragging a card do?
It changes the board order, and the board order decides who works next: the coordinator serves the first ready card in board order.