Written bars, fixed before each measurement. A round that misses a bar does not go live, and bars never move: faster means fewer repetitions of the same instrument, never a weaker one.
Round 8, at promotion
The bars, met
Timed bars as meters with their thresholds; counts as results. Round 8 was promoted on Nov 27, 2026 at 15:27 CET (UTC+1).
View as table
| Measure | Measured | Bar | Result |
|---|---|---|---|
| Floor held after a person speaks | 0.2 s | 2 s | Met |
| Writer stopped (round 8's read) | 10.8 s | 15 s | Met |
| Change reached the board (slowest read) | 980 ms | 2,000 ms | Met |
| Stopped worker reported down (slower read) | 41.5 s | 60 s | Met |
| Team first preview, median | 94.4 s | 120 s | Met |
| Quick first preview, median | 72.6 s | 90 s | Met |
- Core suite4,797 passed, 0 failedPassed
- Quick's hash test2 of 2Passed
- Harness tests208 passed, 0 failedPassed
- Access test479 of 479Passed
- Accessibility, axe-core0 serious, 0 criticalPassed
- Crawl0 dead links; 700 buttons pressed, 0 deadPassed
- Phone sweep636 shots, 0 wider, 0 cutPassed
- Collaboration C01-C1212 of 12 on first runsPassed
- C13, C14, C14MpassPassed
- T-30 sample6 of 6 builds and changes, both rulesPassed
- Open stacks built and loaded12 of 12Passed
- Desktop parity gatepassed twice, controls failingPassed
- The founder's own path58 of 58Passed
The process
Each unit is built on its own branch and its own fresh machine, reviewed by a different agent that did not build it, then fixed.
Written bars
Independent review
Browser-tested, every feature
Judges that must fail
Re-runs only for outside causes
Verdicts
The instruments
What each one does, so a figure on this site can be traced to how it was read.
| Instrument | What it reads |
|---|---|
| T-30 | 30 frozen app briefs built by the real product; a browser agent uses each app on a desktop and a 390 px phone; a judge on a different model rates it under two rules. |
| Collaboration suite | Scripted team scenarios C01 to C14M (asks, handoffs, the floor, Stop, recovery, two people, personas), read by a judge calibrated on fixtures that must fail. |
| Access test | Every route of the deployed server asked as nine kinds of caller; every answer compared with the policy. |
| Accessibility timer | axe-core on every signed-in page every hour; a keyboard-only journey; a contrast test with a planted fault that must fail. |
| Crawl | Follows every link and presses every button of the product. |
| Phone sweep | Every page at four widths: nothing wider than the screen, nothing cut off. |
| Desktop parity gate | 28 pages, light and dark, in the desktop app and a plain window, compared pixel by pixel; planted 1-pixel faults must fail it. |
| The 24-step launch journey | A fresh account through the real sign-up form, one attempt per step, no retries. In verification Its result is not claimed until round 9c reports. |
We publish our misses
A missed bar is a fact like any other.
Rounds 6, 7 and 8 each read NOT READY first
Each cause was named, fixed and measured before promotion.
Phase 1: 10 of 11 exit bars
The last (30 of 30 builds under the strict rule in one full run) is being re-read: full run 8 read 28 of 29.
Lanes: the speed bar Missed
80-87 % of one lane's time against at most 70 %. One lane stays the default; no speed claim. Details
The launch journey is not claimed
It read 24 of 24 on its own branch, then 19 of 24 after a merge, with one cause in the instrument. No claim until round 9c reports.
The register
Every figure on this site, once, with what it is, how it was measured, its sample and its date. Every stat on every page links to its row here.
| Figure | What | How it was measured | Sample | Date |
|---|---|---|---|---|
| 72.6 s | median time to a first preview, Quick build | T-30: 30 frozen app briefs built by the real product; time from the run's start to its first preview that loads without errors. Nearest-rank median. | 30 app briefs, T-30 full run 7 | Nov 22, 2026 |
| 98.4 s | 90th percentile time to a first preview, Quick build | As the median, nearest-rank 90th percentile. | 30 app briefs, T-30 full run 7 | Nov 22, 2026 |
| US$0.102 | median model cost per app, Quick build | The build run's own model calls on the usage ledger. Nearest-rank median. | 30 app briefs, T-30 full run 7 | Nov 22, 2026 |
| US$0.143 | 90th percentile model cost per app, Quick build | As the median, nearest-rank 90th percentile. | 30 app briefs, T-30 full run 7 | Nov 22, 2026 |
| 40.9 s | median time for a change to an app | Edit run start to finish, succeeded edits. | 30 edits, T-30 full run 7 | Nov 22, 2026 |
| US$0.032 | median model cost of a change | The edit run's model calls on the usage ledger. | 30 edits, T-30 full run 7 | Nov 22, 2026 |
| 29 of 30 | builds passed under the strict rule (phone checked at 390 px) | Rule v2: rule v1 plus a phone session at 390 x 844 that both the tester and the judge must pass. | 30 app briefs, T-30 full run 7 | Nov 22, 2026 |
| 30 of 30 | builds and 30 of 30 changes passed under rule v1 | Build succeeded, the check is clean, 80% of must-haves agreed by tester and judge, quality at least 6 of 10. | 30 app briefs, T-30 full run 7 | Nov 22, 2026 |
| 6 of 6 | builds and 6 of 6 changes passed under both rules, latest sample | Six frozen briefs at round 8's verdict; median first preview 70.2 s, median cost US$0.074. | 6 app briefs | Nov 27, 2026 |
| 70.2 s | median first preview in the latest six-brief sample | As T-30, six frozen briefs. | 6 app briefs | Nov 27, 2026 |
| 28 of 29 | builds under the strict rule in full run 8 (the last exit bar asks 30 of 30) | T-30 full run 8; one app's brand text ran under its button on a phone. A new full run is being read. | 29 read app briefs | Nov 27, 2026 |
| 2 of 2 | Quick's hash test at every promotion | A test hashes every request a Quick build sends, so team features can never change Quick. | every promotion | Nov 27, 2026 |
| 1 min 41 s | a habit tracker's first version (US$0.06) | Read from the product's own run record on the screenshot. | one Quick build | Nov 27, 2026 |
| 1 min 15 s | a change to the same app (US$0.05) | Read from the product's own run record on the screenshot. | one change | Nov 27, 2026 |
| 2 min 42 s | an Expo phone app, first version (US$0.09) | Read from the product's own run record on the screenshot. | one Quick build | Nov 27, 2026 |
| US$0.20 | a Documents project of four cards | Read from the product's own run record on the screenshot. | one team run | Nov 27, 2026 |
| US$0.26 | a plan's estimate (about 5 minutes, hard stop US$3.00) | The lead's proposed plan as shown on the screenshot. | one plan | Nov 27, 2026 |
| 11 | languages a brief can be written in, read | Briefs in 11 languages read by Auto (coverage audit PL10). | 11 briefs | Nov 27, 2026 |
| 2 sentences | an unsupported Django brief refused, in the browser and by the server (400) | A brief naming a stack Tennet does not offer is refused with what Tennet can build. | one brief | Nov 27, 2026 |
| 94.4 s | median team first preview | Phase 1 exit read: from Approve to the team's first preview. | phase 1 exit runs | Nov 21, 2026 |
| US$0.287 | median team build cost | The team run's model calls on the usage ledger. | phase 1 exit runs | Nov 21, 2026 |
| US$0.0085 | median cost to answer a person | The floor's replies on the usage ledger. | phase 1 exit runs | Nov 21, 2026 |
| 68.8-104.7 s | the team's first preview after Approve, round 8's three journey reads | 68.8 s, 90.4 s and 104.7 s after Approve. | 3 journey reads | Nov 27, 2026 |
| 572-980 ms | for an accepted change of plan to reach the board | Three reads at round 8: 607, 980 and 572 ms. | 3 reads | Nov 27, 2026 |
| 4.2-10.8 s | for the writing agent to stop when a person speaks | 10.8 s in round 8's read; 4.2 s at the promotion. | 2 reads | Nov 27, 2026 |
| 0.2 s | for the room to give a person the floor | Read at round 8's promotion. | 1 read | Nov 27, 2026 |
| 3,707 of 3,707 | agent lines, each a billed model call, 0 scripted | Every line in the thread matched to its model call on the ledger. | phase 1 exit read | Nov 22, 2026 |
| 12 of 12 | collaboration scenarios C01-C12 on first runs | Scripted team scenarios read by a judge calibrated on fixtures that must fail. | C01-C12 | Nov 27, 2026 |
| 23 of 23 | checks passed with two people in one room (C13) | Each sees the other, every instruction attributed by name, conflicting instructions raise a conflict card both see. | scenario C13 | Nov 27, 2026 |
| PASS | a fact planted in T1's handoff found in T2's prompt and code (C02) | Collaboration scenario C02. | scenario C02 | Nov 27, 2026 |
| 0 | billed calls in the 120 s and 300 s after Stop (C09) | Collaboration scenario C09 reads the ledger after Stop. | scenario C09 | Nov 27, 2026 |
| 0 | steps done twice after the worker was killed mid-turn (C10) | The ledger equals the model calls after the restart. | scenario C10 | Nov 27, 2026 |
| PASS | a planted phone defect found, reported and fixed in the same run (C04) | Collaboration scenario C04. | scenario C04 | Nov 27, 2026 |
| 12 of 12 | runs where agents asked each other and the person (C03, C08) | Collaboration scenarios C03 and C08. | 12 runs | Nov 27, 2026 |
| 7 of 10 | runs an estimate must have held before it is shown | A time estimate shows only while it held the real finish on at least 7 of the last 10 measured team runs. | rule | Nov 27, 2026 |
| 80-87 % | of one lane's wall time with several lanes, at 16-25 % more cost (bar: at most 70 %) | Three runs read 80, 87 and 84 % of one lane's time. The bar was missed, so one lane stays the default. | 3 runs | Nov 25, 2026 |
| 97 | entries in the agent library; 59 can take a seat, 38 say what they wait for | Counted in the product's library source on main. | the library | Nov 27, 2026 |
| 94 % | of a marketplace builder's turns passed Tennet's checks (311 of 332), at US$0.082 a card | Scorecard computed from the rows on every read, as shown on the screenshot. | 332 turns | Nov 27, 2026 |
| 36 of 36 | marketplace scorecards matched an independent meter of the ledger | Every listing's scorecard recomputed from the ledger by a separate meter. | 36 listings | Nov 23, 2026 |
| 14 of 14 | a skill with files passed its paired control | The same card with and without the skill (coverage AG08). | 14 checks | Nov 25, 2026 |
| 9 cards | finished by Kai in 43 turns, at US$0.14 a card | The agent's track record, read from the database, as shown on the screenshot. | one agent | Nov 27, 2026 |
| 76 % | of Rev's 25 reviews approved (19 of 25), at US$0.02 a review | The agent's track record, as shown on the screenshot. | 25 reviews | Nov 27, 2026 |
| 12 s | for a paused agent's turn to yield | Coverage audit AG04. | one pause | Nov 25, 2026 |
| 4 of 4 | generated personas shown before Approve whose card went Done | Coverage audit AG13. | 4 runs | Nov 25, 2026 |
| 104 ms | for a preview error to show at its file and line | Dev panels unit: an error thrown in the preview, timed to the Console. | one error | Nov 22, 2026 |
| 98 of 100 | element picks landed on the right element | Sampled picks in the preview against their source lines. | 100 picks | Nov 25, 2026 |
| 12 of 12 | debugger proofs passed | The preview paused at its line, a server request paused with its argument visible, a removed breakpoint stopped nothing. | 12 proofs | Nov 25, 2026 |
| 7 of 7 | "Fix this" from Problems, both paths | A Quick change, or a card when the policy asks for one. | 7 runs | Nov 25, 2026 |
| 10.9 s | to add a package; removing it left both files byte for byte as before | Manifest and lockfile updated together. | one package | Nov 25, 2026 |
| 3 of 3 | planted security faults found and fixed on both app templates | SQL injection, a plain-text password check and a secret in client code. The controls found them too, so the dedicated pass is not credited alone. | 2 templates | Nov 25, 2026 |
| 11 of 11 | turns whose Context figure equaled the ledger's input tokens | Context panel against the usage ledger. | 11 turns | Nov 22, 2026 |
| 6 to 0 | uses of a corrected brand colour against the old one | A memory note corrected to a new colour; a control project did the reverse. | 2 projects | Nov 22, 2026 |
| 6 | checked links in the answer to a new member's question | Live docs answer with links the docs check has run (coverage CX06). | one question | Nov 26, 2026 |
| 12 of 12 | open stacks built and loaded their preview on the first attempt | One build per open stack at round 8's promotion; ASP.NET Core was the slowest at 383 s. | 12 stacks | Nov 27, 2026 |
| 1,059 | source files checked; none names a stack in a string | A test walks the product's source files. | 1,059 files | Nov 24, 2026 |
| 0.28 s | for a gVisor container to start and exit (about) | Measured on the core's own sandbox service. | core measured facts | Nov 18, 2026 |
| 0.8 s | to copy a stack template (about) | Measured on the core's own sandbox service. | core measured facts | Nov 18, 2026 |
| 262 MiB | for six services, of the sandbox's 2 GB | The app's supervisor started Postgres, MariaDB, FerretDB, Valkey, SeaweedFS and Mailpit. | one app | Nov 25, 2026 |
| 0 of 8 | of another app's service ports answered (all 8 of its own did) | A probe from one app's sandbox against another's. | 2 apps | Nov 25, 2026 |
| 60 of 60 | AI calls matched their ledger rows; refused calls cost nothing | The app's own AI gateway; neither key appeared in any sandbox file, environment or one of 95,075 run events. | 60 calls | Nov 26, 2026 |
| 6,029 ms | to a first version live | Publish to Tennet, from the request to the first answer of the published app. | one publish | Nov 25, 2026 |
| under 1 ms | to roll back; the same bytes by checksum | A rollback changes one routing entry; the first version's bytes compared by checksum. | one rollback | Nov 25, 2026 |
| 1,526 ms | for a container release to go live, rows kept across a second version and a rollback | Always-on container per published app. | one release | Nov 25, 2026 |
| 2,663 ms | to build a 71 MB container image, downloaded with a matching checksum | Built from the stack's own Dockerfile in a build container with no network, then started with compose. | one export | Nov 25, 2026 |
| 20.6 s | for a Go app built from Home to go live | Round 8's operator check. | one app | Nov 27, 2026 |
| 20.2 s | for a killed app server to be back | Health checks every 5 s and restart with back-off. | one kill | Nov 26, 2026 |
| 141.3 s | after a planted failing release went live, it was rolled back | A new version that keeps failing is replaced by the last one that passed. | one release | Nov 26, 2026 |
| 11.1 s | for an alert to reach the owner's Inbox after a load | Under a 400-request load the stored counts matched exactly and percentiles were within 1 ms of the client's. | 400 requests | Nov 26, 2026 |
| 5.0 s | for a custom domain to verify (certificate 1 s later) | Against a test DNS and a test certificate authority. | one domain | Nov 26, 2026 |
| 267 of 267 | deploy-target contract tests (68, 94 and 105 in three groups) | Through the real web app, worker and sandbox service against stand-ins that speak each vendor's documented API. | 11 targets | Nov 26, 2026 |
| 0 | planted vendor tokens found in a 53 MB database dump, 632 columns, the sandboxes and the logs | Each sweep had a positive control that must find a planted value. | every sweep | Nov 26, 2026 |
| 8 ms | for an allowed agent's MCP tool call; the real value appeared in the code | Paired control: without the tool, the agent invented a value. | one paired run | Nov 22, 2026 |
| 61 ms | for a tool call over an OAuth-protected MCP server | The allowed agent finished its card; the one without the tool was sent back twice. | one paired run | Nov 25, 2026 |
| 5 of 5 | webhook formats delivered signed on the first attempt | Tennet, Slack, Discord, Microsoft Teams and Mattermost formats; private addresses refused at creation. | 5 formats | Nov 23, 2026 |
| 5 s | for a labelled tracker issue to become card T2 (recorded payload) | A recorded Linear payload replayed to the trigger. | one trigger | Nov 23, 2026 |
| 12 of 17 | connected apps that work today with a person's own token or public data | Read live against public sites where no credential was needed. | 17 apps | Nov 23, 2026 |
| 12.5 s | for Kai's reply to an outside MCP client's message | An outside client with an API key listed 13 tools, read the board, posted to Kai, stopped the run and opened a diff. | one session | Nov 23, 2026 |
| 26 | documented API operations (9 of them POST) | Counted in the product's route list. | core/apps/web/src/server/api-routes.ts | Nov 27, 2026 |
| 601 | the request answered 429 when the limit is 600 a minute per key | Two web processes sharing one counter: request 600 answered 200, request 601 answered 429. | one key | Nov 25, 2026 |
| 31.8 s | for a stopped worker to be reported down (41.5 s on the second read) | The status page samples each service every 30 s. | 2 reads | Nov 25, 2026 |
| 6 of 6 | builds and changes passed on the OpenAI-compatible route to Google's models | Its own T-30 sample: median first preview 89.6 s, US$0.082 an app. | 6 app briefs | Nov 23, 2026 |
| 479 of 479 | access checks on the deployed server (3,412 answers, 9 kinds of caller, 0 mismatches) | Every route asked as nine kinds of caller. | every route | Nov 27, 2026 |
| 213 of 213 | answers that said "not found" to a member of another organization | OIDC and SAML 2.0 proven in a real browser against Keycloak. | 213 answers | Nov 25, 2026 |
| 14 | planted secret values re-sealed on key rotation; 0 of them in a 58.3 MB dump | 14 values in 9 tables re-sealed and opened on the new key alone. | 9 tables | Nov 25, 2026 |
| 23 | sealed columns in one registry (AES-256-GCM, bound to their row) | Counted on main. | main | Nov 27, 2026 |
| 30 | sign-in attempts per 10 minutes per address (10 per e-mail) | Rate limit on the sign-in route. | rule | Nov 25, 2026 |
| 4,797 | automated tests passed at promotion, 0 failed | The core suite at round 8's promotion (4,806 after one fix forward). | core suite | Nov 27, 2026 |
| 208 | harness tests passed, 0 failed | At round 8's promotion. | harness suite | Nov 27, 2026 |
| 0 | serious or critical accessibility issues over 426 page readings | axe-core on every signed-in page, on an hourly timer, across round 8's three audits. | 426 readings | Nov 27, 2026 |
| 12 of 12 | steps of a keyboard-only journey, 0 pointer events | A keyboard-only journey through the product. | one journey | Nov 27, 2026 |
| 636 | phone screenshots at four widths; none wider than the screen, none cut off | Every page at phone width. | 636 screenshots | Nov 27, 2026 |
| 28 of 28 | page moves drew their own loading skeleton (45-73 ms) | Coverage audit NV05. | 28 moves | Nov 27, 2026 |
| 700 | buttons pressed by the crawl, 0 dead; 0 dead links | A crawler presses every button and follows every link. | every page | Nov 27, 2026 |
| 26 of 26 | fixtures a judge must fail, failed (8 of 8 for the strict rule) | Judges are calibrated on fixtures that must fail before they read a run. | 34 fixtures | Nov 27, 2026 |
| 58 of 58 | steps of the founder's own path, in a browser | At round 8's promotion. | one path | Nov 27, 2026 |
| 218 | findings in QA sweep 1, and 266 checks that passed | Independent readers in a real browser after a promotion; sweep 2 listed 115 entries, 17 major. | sweep 1 | Nov 23, 2026 |
| 1,684 | commits from the rebuild's start (Nov 18) to round 8's verdict | Counted in git; 1,660 carry the AI model's co-author line. | git history | Nov 27, 2026 |
| 671 | committed result folders, with 7,116 screenshots | Counted in git. | harness/results | Nov 27, 2026 |
| 8 | rounds promoted in eight days | Promotion records, Nov 20-27. | TEAM-PLAN §10 | Nov 27, 2026 |
| 8 of 8 | steps of Quick's journey on the packaged Linux build; native checks 23 of 23 | Deep links, downloads, notifications, menus, offline and Settings screens. | one packaged build | Nov 25, 2026 |
| 28 of 28 | pages with 0 differing pixels between the desktop app and a plain window, twice | The parity gate shoots 28 pages, light and dark; planted 1-pixel faults must fail it. | 28 pages | Nov 27, 2026 |
| 0 of 176 | pages with a Tennet mark when an organization's brand is on (in verification) | A crawl as a member, an owner and three kinds of guest; with the brand off the same crawl found a mark on 176 of 176. | 176 pages | Nov 27, 2026 |
| 3.0 min | for Quick's whole journey on a clean machine, on-premise (in verification) | One compose file from images built from Tennet's repository; a valid licence accepted offline. | one clean machine | Nov 27, 2026 |
| Feb 24, 2027 | the earliest day an SLA can be published (after 90 days of measured uptime) | A probe records each service's uptime every minute. | rule | Nov 27, 2026 |
| 185 of 185 | onboarding tour checks (in verification) | The team journey passed with the tour on. | 185 checks | Nov 27, 2026 |
| 23 of 23 | guide steps run against the real product at 1440 and 390 px (in verification) | Each guide step executed in a browser. | 23 steps | Nov 27, 2026 |